System Design and Engineering:

Description
Status
Not started
Due Date
April 1, 2024 → April 2, 2024
Priority
Medium
Project
Task Type
Task
Created by
A. Rahim
Date
Related Tasks
Related back to Tasks
  • Develop detailed engineering designs for the irrigation pipeline and booster pump system.
  • Select appropriate HDPE piping, booster pumps (duty and standby), valves, and meters based on technical specifications and pressure requirements.