Booster Pump Installation:

Description

Installation of two booster pumps (one duty, one standby).

Status
Not started
Due Date
April 15, 2024
Priority
High
Project
Task Type
Task
Created by
A. Rahim
Date
Related Tasks
Related back to Tasks
  • Install two high-efficiency booster pumps—one for duty and one as a standby—to maintain the necessary water pressure throughout Zone 8.
  • Ensure electrical connections are secure and provide an adequate power supply to the pump system.