Smart Water Metering Pricing and Contract Overview

Table 1: Pricing Details for Smart Meters

Feature
Initial Cost per Meter per Month (OMR)
Post-8 Years Cost (OMR)
Notes
Standard Meter
3.0
To be negotiated
Lower cost due to cost recovery over 8 years
Meter with Remote Disconnect
3.5 (discounted from 4.5)
To be negotiated
Cost includes remote disconnection feature

Note: The initial costs include installation, maintenance, and operation. After 8 years, costs will primarily cover software management and possibly additional services.

Table 2: Maintenance and Warranty Details

Period
Maintenance Included
Warranty
Notes
During 8-Year Contract
Yes
Duration of contract
Included in monthly fee
Post-8-Year Contract
To be negotiated
To be negotiated
Likely additional costs for extended maintenance

Strategic Considerations and Recommendations

  1. Post-8-Year Costs: Aim to lock in favorable terms for software and maintenance costs post-contract to avoid significant price hikes.
  2. Extended Warranty: Negotiate for extended warranty periods to cover major components, especially the remote disconnection mechanism.
  3. Flexible Contract Terms: Include clauses that allow for renegotiation or adjustments based on technological advancements or operational needs.

Table 1: Pricing Overview for Smart Water Meters

Feature
Initial Cost per Meter per Month (OMR)
Negotiated Cost per Meter per Month (OMR)
Post-8 Years Potential Cost (OMR)
Standard Meter
3.0
N/A
To be negotiated
Meter with Remote Disconnect
3.5
3.7 (Reduced from 4.5)
To be negotiated
Further Reduced Price
N/A
3.5 (Potential)
To be negotiated

Note: Post-8 years costs are based on minimal monthly charges primarily covering operational costs and are subject to negotiation.

Table 2: Maintenance and Warranty Overview

Period
Maintenance Inclusion
Warranty Coverage Details
During 8-Year Contract
Included in monthly cost (specifics to be confirmed)
Terms to be specified, expected to cover the contract duration
Post-8-Year Contract
To be negotiated (not included as standard)
To be negotiated

Note: Maintenance post-8 years is crucial and should include regular updates and technical support, terms of which must be negotiated prior to contract conclusion.

Table 3: Financial Commitments and Asset Ownership

Item
Details
Asset Ownership Post-Contract
Meters transferred to Muscat Bay; conditions apply
Continuation of Services
Price fixed if continuing with MAAS; exact rate to be negotiated
Exit Strategy Costs
Early termination clauses and penalties (if any) to be clearly defined

Note: Ensuring flexibility in the contract to adapt to future technological and operational changes is essential for long-term viability.

These tables offer a structured view of the pricing, maintenance, warranties, and strategic financial considerations associated with the smart water metering project between Muscat Bay and Tadoom. They serve as a quick reference for key financial details and can be used in discussions and future negotiations to ensure all terms are favorable and transparent.