Daily Operation and Performance Report

Facility Name: Muscat Bay STP

Date: ____________________

Report Prepared By: ____________________

System Capacity: 750 m³/day

Design Flow Rate: 31.25 m³/hr

Initial TMP: 35 kPa

1. Flow Rate Measurements

Tracking of influent, effluent, and internal process flow rates, alongside recorded flow meter parameters for comprehensive monitoring.

Parameter
Design Value (m³/hr)
Morning
Noon
Evening
MBR-1 Treated Water
MBR-2 Treated Water
Total Treated Water
TSE-Irrigation
Influent Flow Rate
31.25
-
-
-
-
-
-
Effluent Flow Rate
31.25
-
-
-
-
-
-
-
Internal Process Flow Rates
Variable
-
-
-
-
-
-
-
MBR-1 Treated Water
-
-
-
-
-
-
-
-
MBR-2 Treated Water
-
-
-
-
-
-
-
-

Detailed Operational Parameters

A comprehensive list of all operational parameters, with morning, noon, and evening readings where applicable.

S No
Description
OEM Range
Morning
Noon
Evening
Quantity
Unit
2
Raw Sewage Inlet Flow
-
-
-
-
-
m³/hr
3
Aeration Blower Pressure
-
-
-
-
-
mbar
4
MBR Blower Pressure
-
-
-
-
-
mbar
5
Aeration DO
-
-
-
-
-
ppm
6
Raw Sewage pH
-
-
-
-
-
-
7
Aeration Tank pH
-
-
-
-
-
-
8
MBR Product pH
-
-
-
-
-
-
9
MBR Product Chlorine
-
-
-
-
-
ppm
10
MBR Backwash Pressure - Stream I
-
-
-
-
-
mbar
11
MBR Backwash Pressure - Stream II
-
-
-
-
-
mbar
12
MBR Product Pressure - Stream I
-
-
-
-
-
mbar
13
MBR Product Pressure - Stream II
-
-
-
-
-
mbar
14
Permeate Flow - Stream I
-
-
-
-
m³/hr
15
Permeate Flow - Stream II
-
-
-
-
-
m³/hr
16
Backwash Flow - Stream I
-
-
-
-
-
m³/hr
17
Backwash Flow - Stream II
-
-
-
-
-
m³/hr
18
Inlet Chamber Tank level
-
-
-
-
-
metre
19
Sludge Holding Tank level
-
-
-
-
-
metre
20
TSE Water Tank Level
-
-
-
-
-
mg/l
21
MLSS in Aeration Tank - Stream I
-
-
-
-
-
mg/l
22
MLSS in Aeration Tank - Stream II
8,000-12,000
-
-
-
-
mg/l
23
MLSS in MBR Tank - Stream I
8,000-12,000
-
-
-
-
mg/l
24
MLSS in MBR Tank - Stream II
8,000-12,000
-
-
-
-
mg/l

Note: The OEM Range column is to be filled in with the manufacturer's specified operating ranges for each parameter, where applicable. The Morning, Noon, and Evening columns are for the actual readings taken at those times, and the Quantity column reflects the last measured value for the day if there are no specific time-based readings.

3. Equipment Status and Observations

Detailed status for each piece of equipment, including any immediate maintenance actions or observations.

S No
Equipment
Description of the Job
Morning Status
Noon Status
Evening Status
Observation/Action
1
SCADA System
System monitoring and control.
2
Chemical Dosing Pumps
Chemical dosing for water treatment.
3
Lifting Station Pumps 1 & 2
Lifting sewage to the treatment plant.
4
Equalization Transfer Pumps 1, 2 & 3
Transferring sewage to treatment units.
5
Anoxic Mixer Stream I & II
Mixing in anoxic tanks.
6
Permeate Pump 1, 2 & 3
Transferring treated water to permeate tank.
7
RAS Pump 1, 2 & 3
Recirculating activated sludge.
8
TSE Water Transfer Pump 1 & 3
Transferring treated water for irrigation.
9
Fine Screen
Screening of incoming sewage.
10
Pre-Treatment Unit
Preliminary treatment of wastewater.
11
OCU
Odor control during treatment.
12
Decanter Unit
Sludge-water separation.
13
Aeration Air Blower 1, 2 & 3
Providing oxygen to aeration tanks.
14
MBR Air Blower 1, 2 & 3
Supplying air to MBR tanks.

Operators are required to fill in the status and observations/actions for each piece of equipment during morning, noon, and evening checks.

4. Maintenance Activities and Issues

Maintenance activities undertaken, including any unresolved issues and outcomes.

Activity
Description
Outcome
Issues/Remarks
Membrane Cleaning
Routine backwash performed
____________________
____________________
Equipment Repair
Seal replacement on Pump #2
____________________
____________________

5. Observations and Recommendations

Immediate concerns or actions taken for decision-making, alongside additional notes on equipment and deviations.

  • Challenges:
  • Actions Taken:
  • Recommendations:
  • Lifting Station Pumps:
  • Decanter Unit:
  • ____________________
  • ____________________

6. Concluding Remarks

Summary of the system's operations for the day, including critical actions required and considerations for future operations.

Operator Signature: _____________________

Supervisor Review: _____________________ (if applicable)

Review Date: ____________________