Status
In progress
Assign
Task | Description | Status |
Obtaining Necessary Permits | Secured all local regulatory approvals and environmental clearances required for the Borewell Project. | ☑️ |
Site Selection | Identified the most suitable location for the borewell after an extensive ground survey. | ☑️ |
Soil Testing and Hydrogeological Assessments | Completed comprehensive soil composition and hydrogeological evaluations to ensure suitability for borewell operations. | ☑️ |
Drilling | Reached the required depth for water extraction, employing advanced drilling rigs and adhering to engineering recommendations. | ☑️ |
Water Level Analysis | Analyzed water levels to establish a baseline for continuous monitoring and management. | ☑️ |
Installation of Casing | Installed protective casing to prevent contamination and maintain structural integrity of the borewell. | ☑️ |
Pump Installation | Set up submersible pumps for efficient and reliable water extraction from the borewell. | [ ] |
Pump Testing | Conducted tests to ascertain the discharge rate and water quality, ensuring operational excellence. | [ ] |
Implementation of Mechanical Works | Executed the setup of mechanical infrastructure required for the borewell functionality, including pumps and control systems. | [ ] |
Implementation of Civil Works | Completed essential structural developments, including access roads and borewell housing, to facilitate easy maintenance and operation. | [ ] |
Water Tapping Strategies | Devised and executed strategies for tapping water for irrigation, prioritizing sustainability and minimal environmental impact. | [ ] |
Final Quality Assurance | Carried out a comprehensive quality check of all borewell components and systems to confirm they adhere to the required standards. | [ ] |
Muscat Bay Requires Team Training and Handover to FM Team for Operation & Maintenance | Organized training sessions for stakeholders on managing and maintaining the borewell system. Formally handed over the project to the operational team. | [ ] |