📓

Technical Evaluation: HVAC, BMS, and Auxiliary Systems AMC Proposals

Technical Evaluation: HVAC, BMS, and Auxiliary Systems AMC Proposals

image

Project Overview

The HVAC system at Muscat Bay plays a crucial role in maintaining comfort and efficiency. Specifically, we focus on the YORK chillers, Building Management Systems (BMS), and pressurization units. These components are essential for ensuring continuous and efficient operation.

Project Goals

Our objectives for this AMC evaluation are as follows:

  • Continuous Operation: Ensure uninterrupted functioning of the HVAC system.
  • Integration and Management: Seamlessly integrate and manage BMS and pressurization units.
  • Service Quality and Reliability: Maintain high standards of maintenance service quality and system reliability.

Scope of Work

We outline detailed maintenance activities encompassing:

  • Preventive Maintenance: Regular checks and upkeep.
  • Emergency Repairs: Swift response during breakdowns.
  • Parts Management: Efficient handling of spare parts.
  • System Monitoring: Continuous monitoring of chillers, BMS, and pressurization units.

Current Roadblocks and Barriers

We address existing challenges:

Identify and replace aging parts in YORK chillers to prevent breakdowns
Improve integration between BMS and pressurization units
Evaluate and enhance performance of the emergency response team
Assess and address quality inconsistencies of the current maintenance contractor
Develop strategies to minimize downtime and improve system reliability

Evaluation Metrics and Criteria

We evaluate proposals based on:

Category
Weight
Assessment
System Coverage and Integration
20%
Evaluate the extent to which the proposal covers critical systems, including chillers, Building Management Systems (BMS), and pressurization units. Consider the depth of integration plans and strategies proposed by the contractor.
Preventive Maintenance Specificity
20%
Examine the level of detail provided in the preventive maintenance plan outlined in the proposal. Assess alignment with industry best practices.
Emergency Response Capabilities
15%
Review the provisions for emergency support presented in the proposal. Evaluate the specified number of emergency calls.
Technical Staff Qualifications
15%
Consider the qualifications and expertise of the technical team proposed by the contractor. Look for evidence of relevant certifications and practical experience.
System Monitoring and Diagnostics
15%
Examine the proposal's approach to system health monitoring. Evaluate the diagnostic tools mentioned and their frequency of use.
Compliance with Safety and Standards
15%
Verify that the proposed maintenance practices comply with safety standards. Seek documentation and proof of adherence to both local and international regulations.

Documentation

RFP
AMC
Appendix of Annual Maintenance Contract
BMS PPM Checklist

Proposals for AMC

DESERT INTERNATIONAL OFFER
GENETCOO OFFER
GULF EXPERT OFFER

First Technical Evaluation